CDA DV 710 Dokumentacja Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 36
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 26
27
Installation "A" between Existing Side Cabinets (560 or 600 mm GAP)
(figs. 24, 25, 26, 28)
Mount the 2 (two) metal supports B (supplied with the
appliance in a separate kit) as indicated in Figs. 25 or 28).
Fig. 28 only - prepare 2 wood uprights A (width 20-50
mm, thickness 18 mm, length 650 mm); mount the 2 wood
uprights “A” to the cabinet walls as indicated in figure.
Build in the double oven making it slide on the metal
supports “B”.
Installation "B" between Side Cabinets by
Removing Provious Housing (figs. 27, 28)
– Remove previous housing.
Mount the 2 (two) metal supports B (supplied with the
appliance in a separate kit) as indicated in Fig. 28.
Prepare 2 wood uprights A(width 20-50 mm, thickness 18
mm, length 650 mm); mount the 2 wood uprights “Ato the
cabinet walls as indicated in figure.
Build in the double oven making it slide on the metal
supports “B”.
Fig. 25
(*) Measure calculated from the
underneath of the worktop to the top
support base of the Bsupports.
560 mm Gap
560 mm Gap
Installation “A
Fig. 24
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 35 36

Komentarze do niniejszej Instrukcji

Brak uwag